Posts tagged ‘paving’

November 22nd, 2012

Paving Still Continues

by Christopher O'Brien

Road paving isn’t quite done in Wolcott quite yet this year. Many streets have been paved recently, including Town Line Rd. and Potoccus Ring Road. Getting up and into various driveways has proven to be a challenge for some residents who say the 3-4 inch lip of asphalt has wreaked havoc on some smaller vehicles. Mayor Dunn says that there is a reason for it though. “They’re going to come back for a second coat of pavement,” he tells the Whisper. At that point the pavers will flatten out the lips of driveways and other connections that need to be made.

Tags: